Existing - 3/25/12
|
screen enclosure down
|
ceiling sheetrock gone
|
a little electrical work
|
new gas lines
|
|
getting ready to rip off unwanted stucco
|
|
|
|
forms for a new stem wall
|
|
|
|
50 cent prize if you can guess the code
|
|
new stem wall
|
|
new framing for monster windows
|
- and a new door
|
|
|
|
|
|
high density insulation
|
|
|
R-30 insulation, only 5 inches thick
|
|
new ceiling sheetrock
|
|
|
monster windows installed
|
and a new door
|
ceiling finishing
|
|
|
the spa is now outside - temporarily
|
|
stucco lath
|
don't prime me
|
ready to stucco
|
|
|
|
what a mess
|
|
stucco done
|
|
|
Cleaning the floor
|
|
Paint sample
|
New epoxy floor coating
|
|
Ceiling paint
|
|
|
Wall painting
|
|
|
|
|
Air conditioner mounting plate
|
Indoor unit
|
Outdoor unit
|
Heater
|
New use for an old fan
|
New outdoor patio fan
|
Wall sconces
|
|
|
|
Old shades back - now with motors
|
Spa back inside
|
and exercise equipment
|
|
|
Finished
|
|